Fire Safety for Architects

Designing Safe, Open and Visually Striking Buildings

Modern architecture often favours openness, natural light and visual connection. Atriums, open staircases, large entrances and interconnected spaces can make buildings more welcoming and easier to navigate, but they can also create challenges for fire compartmentation.

For architects, fire protection should therefore be considered alongside the architectural concept from an early stage. Where permanent walls or conventional fire doors would significantly affect the intended layout, fire curtains and smoke curtains may provide an alternative where appropriate to the project’s fire strategy. When correctly specified, they can remain discreet during normal use and deploy when required.

At NECO Fire Gard, we work with architects and specifiers to integrate fire and smoke curtain systems into commercial and industrial buildings while considering both fire safety and design intent. Contact us today on +44(0)2920 667 555 to discuss fire safety solutions for your architectural project.

The Fire Safety Challenge in Open-Plan Architecture

Open-plan architecture removes many of the physical divisions traditionally found within buildings. This creates flexible, visually connected environments, but it can also make passive fire compartmentation more complex.

Large floorplates, open circulation areas and connections between spaces may affect how fire and smoke could spread. The goal is not simply to introduce more barriers, but to understand where separation is required and find fire safety solutions that work with the architecture.

What Does Fire Compartmentation Need to Achieve?

Fire compartmentation divides a building into areas intended to restrict the spread of fire and, where required, smoke. It can help contain an incident, protect other areas and support the building’s evacuation strategy.

For architects, continuity is important. Doorways, service penetrations and architectural openings can all affect a compartment boundary, so these elements need to be considered as part of the complete fire safety design.

Where Can Open Designs Create Compartmentation Challenges?

Challenges commonly occur where the architectural concept deliberately creates connections across compartment boundaries. These might include interconnected floorplates, large openings, open circulation spaces and voids between storeys.

Identifying them during design development gives architects and fire engineers greater opportunity to address fire protection without unnecessarily changing the original concept.

At NECO Fire Gard, our fire and smoke curtain systems can provide discreet protection for suitable open-plan applications where their use forms part of the building’s fire strategy. Call us today on +44(0)2920 667 555 for technical guidance on integrating fire protection measures into open architectural spaces.

Open Architectural Spaces That Require Fire Strategy Consideration

Some of the features that give contemporary buildings their visual impact also require particular consideration within the fire strategy because they connect areas that might otherwise be separated.

Atriums and Multi-Storey Voids

Atriums can bring natural light through multiple levels and create strong visual connections throughout a building. Their vertical openness, however, means the potential movement of fire and smoke between storeys needs to be considered.

Depending on the fire strategy, protection may be required around parts of the atrium or between the void and adjoining accommodation. Where permanent construction would undermine the intended openness, deployable systems may form part of the fire safety solution.

Open Staircases and Escape Routes

Open staircases provide circulation between floors while often acting as prominent architectural features. Because they create a direct connection between levels, architects also need to consider their relationship with fire and smoke movement and the wider escape strategy.

The appropriate approach will depend on the building, making coordination between the architect and fire engineer particularly important. Similar considerations apply to other open architectural layouts where maintaining an unobstructed space is central to the design.

Wide Entrances and Large Openings

Wide entrances and large openings are common in reception areas, offices, hotels, retail environments and public buildings. They can improve circulation and preserve sightlines, but difficulties arise where an opening crosses a required compartment boundary.

In these situations, permanent construction may significantly alter the space. A suitable deployable system will provide protection while allowing the opening to remain clear during everyday use.

At NECO Fire Gard, we specialise in fire and smoke curtain systems for atriums, open staircases and large architectural openings across commercial and industrial projects. Phone us today on +44(0)2920 667 555 to explore suitable fire protection solutions for your building design.

When Permanent Fire Walls and Shutter Doors Conflict with the Design

Fire-resisting walls and shutter doors remain important methods of compartmentation, but permanent barriers may not suit every architectural environment. A fire wall across a reception area can interrupt sightlines, while conventional shutter doors across a large opening may restrict circulation or change the character of the interior.

Where the fire strategy allows, deployable systems such as fire curtains and smoke curtains can keep the space open during normal use and provide the required separation when activated.

Fire Curtains and Smoke Curtains: Understanding the Difference

Fire curtains and smoke curtains have different functions. A fire curtain is designed to provide defined fire-resisting performance, while a smoke curtain is primarily intended to control or channel smoke movement.

The project’s fire strategy should establish what is required before a system is selected. This ensures performance, rather than appearance alone, determines the specification.

At NECO Fire Gard, our technical team can advise architects and specifiers on fire and smoke curtain solutions for different openings and architectural designs. Get in touch with us today on +44(0)2920 667 555 for practical guidance on selecting a suitable system for your building project.

Concealing Fire Protection Within the Architecture

Considering fire and smoke curtains early gives architects greater opportunity to integrate their components discreetly into the finished building.

Ceiling Voids, Recesses and Headbox Requirements

Fire and smoke curtain systems require sufficient space for their specified components, which may include the headbox, guides, controls and associated equipment depending on the system configuration.

Headboxes can often be incorporated into ceiling voids, bulkheads or purpose-designed recesses. However, concealment needs to be practical. Suitable space, supporting construction and fixing arrangements must all be considered before architectural details are finalised.

Coordinating with Building Services

Fire and smoke curtain systems may share ceiling space with lighting, ductwork, sprinklers, cable trays and electrical services. Their deployment path also needs to remain clear.

Early coordination between the architect, M&E team and fire and smoke curtain specialist can identify potential clashes before installation and avoid unnecessary changes to ceilings or building services later.

Allowing for Future Inspection and Maintenance

A concealed system still needs to remain accessible. Fire and smoke curtains require ongoing inspection, testing and maintenance, so suitable access should be incorporated into the architectural detail from the beginning.

At NECO Fire Gard, we work with architects and fire engineers to integrate fire and smoke curtain components discreetly into the surrounding architecture. Reach out to us today on +44(0)2920 667 555 to discuss the practical integration of fire and smoke curtain systems within your project.

What Architects Need to Specify for Fire and Smoke Curtains

A fire or smoke curtain specification needs to define what the system must achieve, not simply the dimensions of the opening.

Fire and Smoke Performance Requirements

The correct system will depend on the required fire resistance, whether smoke control is also needed, the opening dimensions and configuration, and the surrounding construction.

These requirements should be determined from the project’s fire strategy, which defines the role the system needs to perform within the building’s overall approach to fire safety.

Controls and Building System Interfaces

Fire and smoke curtains need to operate correctly with the building’s wider fire safety systems. This can include integration with the building’s smoke detection and fire alarms, together with the controls responsible for deployment.

Agreeing these interfaces early helps avoid coordination issues between the curtain system and other building services during installation.

BS 8524 and Fire Curtain Specification

BS 8524 is an important consideration for active fire curtain barrier assemblies and should be considered where applicable alongside your project’s fire strategy and relevant regulatory requirements.

Architects should consider the complete assembly instead of focusing solely on the curtain fabric. Controls, guides, supporting components, installation, commissioning and ongoing maintenance all contribute to the intended operation of the system.

At NECO Fire Gard, our experienced team provides technical information to guide architects and specifiers when integrating fire and smoke curtain systems into building designs. Speak to us today on +44(0)2920 667 555 for professional support with your fire safety project specification.

Getting Fire Protection Details Right Before System Construction Begins

Early specification can make fire protection considerably easier to integrate. Once structural details, ceiling levels and building services have been fixed, the available options may become more limited.

What Should Be Resolved During Design Development?

Before key architectural details are finalised, the design team should establish:

  • the location of relevant compartment boundaries and required performance
  • the size and configuration of the openings
  • structural fixing and headbox requirements
  • controls and interfaces with other building systems and
  • access for future inspection, testing and maintenance

Considering these requirements together can reduce the risk of late design changes and installation complications.

Who Should Be Involved in the Specification Process?

Fire and smoke curtain integration requires collaboration. Architects coordinate the system with the building design, while fire engineers establish the relevant fire strategy and performance requirements. Building Control, contractors, and M&E designers may also need to contribute.

As a specialist fire and smoke curtain manufacturer, we provide system-specific information on dimensions, fixing arrangements, controls and installation requirements.

When Should a Fire and Smoke Curtain Manufacturer Be Consulted?

Manufacturer input is most useful while there is still flexibility in the design. This is particularly important for large or unusual openings, restricted ceiling spaces and areas where the curtain must coordinate closely with other building systems. Early consultation can help develop suitable fire protection solutions before construction begins.

At NECO Fire Gard, we work alongside architects, fire engineers, Building Control and project teams to identify practical fire and smoke curtain considerations before critical design details are finalised. Email us today with your project requirements for tailored system specification support.

Balancing Fire Safety and Architectural Design

Fire safety and architectural ambition do not have to work against each other. Atriums, open staircases, large entrances and interconnected spaces can remain important features when their implications are properly addressed within the fire strategy.

Considering fire protection while the architecture is still developing gives greater opportunity to coordinate compartmentation, escape arrangements, structural requirements and building services without unnecessarily changing the finished design.

Where fire or smoke curtains are appropriate, early planning can also allow system components to be concealed more effectively, preserving the clean lines and open spaces that define the architectural concept.

How NECO Fire Gard Supports Architectural Projects

NECO Fire Gard works with architects, M&E designers and fire safety consultants to integrate tailored fire and smoke curtain systems into building designs.

Our technical input can cover system configuration, opening dimensions, headbox and guide requirements, structural interfaces, controls and installation considerations. By addressing these practical requirements during design and specification, potential conflicts can be identified before construction begins.

We help coordinate fire protection with the wider building design so that practical considerations can be addressed without unnecessarily compromising the architectural concept. With our expertise involved early, architects can preserve their design intent while ensuring the specified system meets the requirements established by their wider fire strategies.

At NECO Fire Gard, we assist clients from initial design and specification through to the installation of fire and smoke curtain systems in commercial and industrial buildings. Call us today on +44(0)2920 667 555 for expert support with your fire protection project.

Frequently Asked Questions

1. What should architects consider when planning fire safety for open-plan buildings?

Architects should consider fire compartmentation, smoke movement, and the way people will move through the building during an emergency. A suitable fire safety plan should account for features such as atriums, open staircases, large entrances, and interconnected floors, particularly where these features could affect the spread of fire and smoke.

2. How can a fire risk assessment influence an architectural design?

A fire risk assessment can identify potential fire hazards and help determine where protection or separation may be required. Depending on the project, a fire risk appraisal or fire risk safety assessment may also inform decisions about compartmentation and other design considerations. The approach should reflect the building’s layout, occupancy level, and overall fire risk profile.

3. How can fire compartmentation be maintained without permanently closing an open space?

Where appropriate to the building’s fire strategy, deployable smoke and fire curtains can provide fire-resisting separation across a suitable opening while remaining retracted during normal use. This can help preserve sightlines and circulation where a permanent wall or conventional steel fire door would significantly affect the architectural concept.

4. What fire safety issues can atriums and multi-storey voids create?

Atriums and multi-storey voids create vertical connections that may allow fire and smoke to move between levels. Depending on the building design, safety measures could include fire compartmentation, smoke control, automatic opening vents, or a sprinkler system. The appropriate solution should be determined by the overall fire strategy and relevant fire safety guidance.

5. How can open staircases affect evacuation from a building?

Because open staircases connect different levels, their relationship with smoke movement and evacuation routes needs careful consideration. Architects and fire engineers should consider how they interact with the wider fire escape plan and whether additional protection is required to support evacuation planning.

6. What is the difference between fire curtains, smoke curtains and other fire safety products?

A fire curtain provides defined fire-resisting performance, while a smoke curtain is primarily intended to control or channel smoke movement. Other fire protection products, such as fire extinguishers and smoke alarms, perform different functions and should not be considered substitutes for compartmentation where fire-resisting separation is required.

7. What do Building Regulations and Approved Document B mean for architects designing open spaces?

Building Regulations establish requirements that need to be considered during building design, while Approved Document B provides guidance relating to fire safety in England. Architects designing large openings, atriums and other connected spaces should consider the applicable requirements alongside each project’s fire strategy and proposed protection systems.

8. Which fire safety legislation may need to be considered during a building project?

The legislation that applies depends on the building, its location, use and project scope. The wider regulatory landscape can include the Regulatory Reform Order 2005, Fire Safety Act 2021, and Building Safety Act 2022, alongside other applicable fire safety regulations. The Fire Precautions Act 1971 may appear in older building documentation, but current projects should be considered against the requirements that apply today.

9. Is PAS 9980 relevant when architects are specifying fire and smoke curtains?

PAS 9980 relates to the fire risk appraisal of external wall construction and cladding of existing multi-storey and multi-occupied residential buildings rather than directly governing fire or smoke curtain specification. It may be relevant to the wider assessment of certain external wall assemblies, but the performance required from a fire or smoke curtain should be established separately through the project’s specific fire strategy and applicable system requirements.

10. How can smoke and fire curtains interact with a building’s other fire protection systems?

Depending on the design, a smoke or fire curtain may need to interface with fire detection and smoke alarm systems so that deployment occurs as intended. Coordination may also be required with building services and other fire suppression systems. Controls and interfaces should therefore be established before installation and checked during commissioning.

11. Do commercial premises and mixed-use properties require different approaches to fire protection?

Yes. Commercial premises and mixed-use properties can differ significantly in occupancy, layout, circulation, and how different areas of the building are used. These factors can influence the fire protection required around large openings and connected spaces, so the approach should be tailored to each building.

12. What responsibilities should be considered after a fire or smoke curtain system has been installed?

Once a building is occupied, relevant duties may apply to responsible persons under the applicable requirements. Fire and smoke curtain systems also need appropriate inspection, testing, and maintenance, so architects should allow access for future building safety checks and fire safety inspection activities when developing concealed ceiling and headbox details.

13. What documentation should be retained for installed fire protection systems?

The documentation required will depend on the building and the systems installed. It may include commissioning information, testing and maintenance records, and relevant fire safety system certificates. Keeping appropriate records can support future inspection, a fire safety audit, and the ongoing management of installed protection systems.

14. Why should a fire and smoke curtain specialist be involved early in the design process?

Early involvement allows a fire and smoke curtain specialist to advise on system dimensions, structural fixing requirements, headboxes, guides, controls, and interfaces with other building services while the architectural design can still be adjusted. This can help prevent installation conflicts, reduce the need for late design changes, and ensure suitable access is incorporated for future inspection, repair, service, and maintenance.

15. Can NECO Fire Gard help architects integrate fire and smoke curtains into their projects?

Yes. At NECO Fire Gard, we work with architects, fire engineers, M&E designers, Building Control and project teams to integrate fire and smoke curtain systems into commercial and industrial buildings. Our technical input can cover system configuration, opening dimensions, headbox and guide requirements, structural interfaces, controls, installation considerations, and future maintenance access. Contact us today on +44(0)2920 667 555 to discuss the fire and smoke curtain requirements for your project.